摘要

Abstract

A shield mule is developed as a stable large platform equipment by the Datong Coal Mine Group,which is used to remove the heavy equipment on the working face in the "comprehensive mechanized face moving process" of large-scale mine.The shield mule employs a full hydraulic transmission system to solve the problems such as breaking rope,toppling,insufficient power and so on existing in the removal processing of traditional equipment.In order to guarantee the stability and safety in the working process of shield mule,a stable parking hydraulic system is designed,and there are four hydraulic cylinders working for that.The stable parking hydraulic system of the shield mule is modeled and simulated based on AMESim,and the output characteristics and parameters of the solenoid valve and the four hydraulic cylinders are obtained.The results show that the four working hydraulic cylinders can reach the working pressure of 21.3 MPa in a short time;the output parameters are stable,and the output pressure of the four hydraulic cylinders is consistent,and the stability of the shield mule can be fully guaranteed.

关键词

稳车液压系统/综合机械化搬迁工艺/回撤吊车/一致性

Key words

stable parking hydraulic system/comprehensive mechanized moving process/shield mule/consistency

分类

机械制造

引用本文复制引用

王晨升,苏芳,张占东,李渊..基于AMESim回撤吊车稳车液压系统设计及仿真分析[J].液压与气动,2018,(2):57-62,6.

基金项目

大同市平台基地项目(2017-159) (2017-159)

大同市重点研发计划项目(2017-014) (2017-014)

大同市科技基础条件平台建设项目(2016-141) (2016-141)

液压与气动

OA北大核心CSTPCD

1000-4858

访问量0
|
下载量0
段落导航相关论文