| 注册
首页|期刊导航|电力系统自动化|燃气三联供—热泵容量优化匹配分析方法

燃气三联供—热泵容量优化匹配分析方法

何桂雄 黄子硕 闫华光 彭震伟 于航 杨柯

电力系统自动化2018,Vol.42Issue(4):25-29,5.
电力系统自动化2018,Vol.42Issue(4):25-29,5.DOI:10.7500/AEPS20170905007

燃气三联供—热泵容量优化匹配分析方法

Analytical Method for Capacity Matching Optimization of CCHP-HP

何桂雄 1黄子硕 2闫华光 1彭震伟 2于航 2杨柯3

作者信息

  • 1. 电网安全与节能国家重点实验室,中国电力科学研究院有限公司,北京市100192
  • 2. 高密度人居环境生态与节能教育部重点实验室,同济大学,上海市200092
  • 3. 上海朗诗规划建筑设计有限公司,上海市200092
  • 折叠

摘要

Abstract

The capacity matching optimization of various heating and cooling sources,such as the combined cooling,heating and power-heat pump(CCHP-HP)system,is one of the important tasks for planning and designing the integrated energy system. This paper proposes an analytical method which can identify the optimized matching capacity of CCHP-HP system.The method is based on the formulation of net present value(NPV)of unit installed capacity within different scenarios.Combined with the frequency statistics of each load internal,the equivalent full load service hours of CCHP-HP and the corresponding income are acquired under different capacity matching schemes.The optimal scheme of CCHP-HP can be acquired from the comparison of total NPV value.Combined with a case study,the advantages of the proposed method are illustrated and it is convenient for the participants to make appropriate decisions.

关键词

综合能源/燃气三联供/热泵/容量匹配优化/负荷频数/运行时数

Key words

integrated energy system/combined cooling/heating and power(CCHP)/heat pump(HP)/capacity matching optimization/load time frequency/service hours

引用本文复制引用

何桂雄,黄子硕,闫华光,彭震伟,于航,杨柯..燃气三联供—热泵容量优化匹配分析方法[J].电力系统自动化,2018,42(4):25-29,5.

基金项目

国家重点研发计划资助项目(2016YFC0700305) (2016YFC0700305)

国家电网公司科技项目(SGTJDK00DWJS1500100).This work is supported by National Key R&D Program of China(No.2016YFC0700305)and State Grid Corporation of China(No.SGTJDK00DWJS1500100). (SGTJDK00DWJS1500100)

电力系统自动化

OA北大核心CSCDCSTPCD

1000-1026

访问量1
|
下载量0
段落导航相关论文