Due to the problem of high energy cost in mine underground drainage system,a mathematical model considering time-of-use electricity tariff is presented. In this model,the water levels of water reservoir in each period are chosen as the constraint condition of the model,the number of open pump sets is in each period is chosen as the decision variable,while the minimum daily energy cost of the pump units is treated as the objective function of the operational model. And then the artificial bee colony algorithm is used to solve the model and get the best control sequence. Finally,the operation of a coal mine drainage system is taken as an example. The results show that the optimized operation scheme can reduce the drainage cost significantly under the condition of meeting the mine drainage requirements and ensuring the safety production.关键词
泵机组/人工蜂群算法/运行优化Key words
pump units/artificial bee colony algorithm/operation optimization分类
机械制造引用本文复制引用
刘伟,周邵萍,李长龙,薛胜雄,王从译..基于人工蜂群算法的矿山泵机组运行优化[J].流体机械,2018,46(1):56-61,6.基金项目
国家科技支撑计划项目(2013BAF01B01) (2013BAF01B01)