计轴叠加同时解决分路不良及漏泄大方法探讨

张谈顺

铁路通信信号工程技术2018,Vol.14Issue(1):56-58,3.
铁路通信信号工程技术2018,Vol.14Issue(1):56-58,3.DOI:10.3969/j.issn.1673-4440.2018.01.013

计轴叠加同时解决分路不良及漏泄大方法探讨

Measures of Solving Problems of Poor Track Circuit Shunting and Large Railway Bed Leakage by Overlapping Axle Counter Circuit and Existing Track Circuit

张谈顺1

作者信息

  • 1. 大秦铁路股份有限公司太原电务段,太原 030031
  • 折叠

摘要

Abstract

This paper briefly introduces the principles of solving the poor track circuit shunting and the large railway bed leakage affecting the organization of train operation by the axle counter circuit systematically,describes the issues such as there is no function to check broken rail only by the axle counting device,the coding section should be equipped with a dedicated code sending channel to avoid incorrect triggering,and discusses the overlap method between axle counter circuit and existing track circuit.It puts forward the specific proposals to simultaneously solve the problems of poor track circuit shunting and large railway bed leakage.

关键词

计轴叠加/分路不良/道床漏泄/探讨

Key words

axle counters overlap/poor shunting/railway bed leakage/discussion