钢管柱混凝土顶升施工工艺在码头工程中的应用

于一虎 罗松

港工技术2018,Vol.55Issue(1):76-79,4.
港工技术2018,Vol.55Issue(1):76-79,4.DOI:10.16403/j.cnki.ggjs20180119

钢管柱混凝土顶升施工工艺在码头工程中的应用

Lift-up Technology of Concrete-filled Steel Tubular Column Applying to Port Construction

于一虎 1罗松2

作者信息

  • 1. 中交第一航务工程勘察设计院有限公司,天津 300222
  • 2. 天津中北港湾工程建设监理有限公司,天津 300040
  • 折叠

摘要

Abstract

The lift-up technology of concrete-filled steel tubular column is a kind of concrete pouring method. The pressure of the concrete conveying pump pushes self-compacting micro-expansion concrete into the hole at the bottom of steel tubular column until the whole steel tubular column is fully filled with concrete. This technology is superior to the traditional technology from the aspects of construction quality, safe management, progress control and cost control. The design of concrete mix proportion, selection of concrete delivery pump, major construction methods and integral benefit are analyzed and summarized.

关键词

钢管柱混凝土/顶升工艺/配合比/截止阀/输送泵/效益/港口/港口工程

Key words

concrete-filled steel tubular column/lift-up technology/mix proportion/cut-off valve/conveying pump/beneficial result/harbor/port engineering