隧道竖井开挖过程FLAC3D的数值模拟

刘优平 张晓炜 刘泽华

南昌工程学院学报2018,Vol.37Issue(1):28-32,5.
南昌工程学院学报2018,Vol.37Issue(1):28-32,5.

隧道竖井开挖过程FLAC3D的数值模拟

Numerical simulation of shaft tunnel excavation process with FLAC3D

刘优平 1张晓炜 2刘泽华1

作者信息

  • 1. 南昌工程学院 江西省水利土木工程基础设施安全重点实验室
  • 2. 江西省水利土木特种加固与安全监控工程研究中心,江西南昌330099
  • 折叠

摘要

Abstract

In view of the problems of deformation and destruction that occur in the process of the shaft tunnel excavation on Xiamen Amoy Circular Road,we take the geological survey data as the background to carry the three-dimensional numerical simulation analysis of the tunnel vertical shaft excavation process using the finite difference software FLAC3D.The calcula-tion results show that the maxium vertical displacement of the shaft bottom heave that appeared at the excavation depth of 27 m was 66.2 mm;that the maximum displacement of the shaft sidewall that appeared at residual clay layer was 8.37 mm;and that the range of plastic zone in the vertical direction in the process of excavation extended to-29 m,horizontal expand to -14 m to 14 m respectively.Finally,we suggest improving the strength of support in plastic area during the vertical shaft exca-vation process and decreasing the deformation of the surroundings.

关键词

隧道竖井开挖/三维数值模拟/应力/变形

Key words

shaft tunnel excavation/3D numerical simulation/stress/deformation

分类

矿业与冶金

引用本文复制引用

刘优平,张晓炜,刘泽华..隧道竖井开挖过程FLAC3D的数值模拟[J].南昌工程学院学报,2018,37(1):28-32,5.

基金项目

国家自然科学青年基金资助项目(51409140) (51409140)

江西省自然科学基金资助项目(20151BAB213027) (20151BAB213027)

瑶湖学院学生创新基金项目(YHCX-16-6-2) (YHCX-16-6-2)

南昌工程学院学报

1674-0076

访问量0
|
下载量0
段落导航相关论文