涪陵页岩气田西南区块压裂改造工艺现场试验

习传学 高东伟 陈新安 王海涛

特种油气藏2018,Vol.25Issue(1):155-159,5.
特种油气藏2018,Vol.25Issue(1):155-159,5.DOI:10.3969/j.issn.1006-6535.2018.01.032

涪陵页岩气田西南区块压裂改造工艺现场试验

Field Test of Fracturing Technology in the Southwest Section of Fuling Shale Gas Field

习传学 1高东伟 1陈新安 1王海涛2

作者信息

  • 1. 中国石化重庆涪陵页岩气勘探开发有限公司,重庆 408014
  • 2. 中国石化石油工程技术研究院,北京 100101
  • 折叠

摘要

Abstract

The southwest section of Fuling Shale Gas Field is featured by well development of faults and complex distribution of curvature and fractures. Serious fluid loss,great difficulty in sanding and low well productivity after fracturing are frequent in the fracturing operation,which indicates relatively poor applicability of fracturing technol-ogy in the main section.Based on the comprehensive analysis of fractured wells,the diverting fracturing by tempora-ry plugging,definite plane perforation,volume and sanding timing optimization of fine ceramsite,stage and cluster spacing optimization and other countermeasures are used to improve fracturing operation and enhance fracturing per-formance. Field application shows that for the current shale gas reservoir fracturing operation,the times of adding temporary plugging agent should be controlled,the adding of internal temporary plugging agent must be suspended within a short period in case of a sign of screen out and a certain amount of hydrochloric acid needs to be injected after adding the inter-cluster temporary plugging agent to reduce operating pressure. The adding of inter-cluster temporary plugging agent leads to a distinct response of pump pressure and fracturing diversion from microseismic monitoring. Definite plane perforation is effective in the section with high curvature. Increasing the amount of fine ceramsite in the initial stage of fracture generation can improve fracturing operation efficiency and increase the prop-pant concentration. Appropriate adding of fine ceramsite in advance could effectively reduce fluid loss and operation risk and improve fracturing performance by combining with graded pumping-rate control,glue expansion,particle size adjustment and other processes.For the fracturing stage with a relatively small angle between the well trajectory and the maximum principal stress,the stage and cluster spacing can be appropriately enlarged to improve fracturing performance. This field test could provide certain reference for the fracturing operation of similar wells.

关键词

页岩气/压裂/定面射孔/暂堵转向/涪陵

Key words

shale gas/fracturing/definite plane perforation/diverting by temporary plugging/Fuling

分类

能源科技

引用本文复制引用

习传学,高东伟,陈新安,王海涛..涪陵页岩气田西南区块压裂改造工艺现场试验[J].特种油气藏,2018,25(1):155-159,5.

基金项目

国家科技重大专项"涪陵页岩气田开发示范工程"(2016ZX05060) (2016ZX05060)

特种油气藏

OA北大核心CSCDCSTPCD

1006-6535

访问量0
|
下载量0
段落导航相关论文