华南地震2017,Vol.37Issue(z1):23-29,7.DOI:10.13512/j.hndz.2017.S1.003
广东"十五"测震台仪器方位角普查校正工作
Verification of the Seismometer's Azimuth of Guangdong Seismic Stations in the"10th Five-Year Plan"
陈建涛 1谢剑波 2卢子晋3
作者信息
- 1. 广东省地震局,广州510070
- 2. 中国地震局地震监测与减灾技术重点实验室,广州510070
- 3. 广东省地震预警与重大工程安全诊断重点实验室,广州510070
- 折叠
摘要
Abstract
Guangdong Province Earthquake Monitoring Center carry out azimuth survey and correction for the"10th Five-Year Plan"seismometer from August 2012 to December, and a total number of 43 ground seismic stations pass the acceptance in September 2013. This work was summarized as follows: the research institutions and researchers can reference and use the seismometer's azimuth survey data, especially of the high level accuracy of the seismometer's azimuth. Based on the results, the deviation calibration time and seismometer model, the historical data before correction can be processed with rotating the same angle in the opposite direction.关键词
方位角/普查/校正/测震仪Key words
Horizontal azimuth/Survey/Correct/Seismometer分类
天文与地球科学引用本文复制引用
陈建涛,谢剑波,卢子晋..广东"十五"测震台仪器方位角普查校正工作[J].华南地震,2017,37(z1):23-29,7.