| 注册
首页|期刊导航|电力系统保护与控制|基于Dijkstra算法的配电网孤岛划分

基于Dijkstra算法的配电网孤岛划分

姚玉海 张璇 齐伟强 张岩

电力系统保护与控制2017,Vol.45Issue(24):36-43,8.
电力系统保护与控制2017,Vol.45Issue(24):36-43,8.DOI:10.7667/PSPC162124

基于Dijkstra算法的配电网孤岛划分

Island partition of the distribution system based on Dijkstra algorithm

姚玉海 1张璇 2齐伟强 1张岩1

作者信息

  • 1. 国网北京市电力公司电力科学研究院,北京100075
  • 2. 国网北京市电力公司物资分公司,北京100053
  • 折叠

摘要

Abstract

Traditional island partition method does not use network topology properly,has bad searching performance,etc.Aiming at these problems above,this paper proposes an island partition method for distribution system based on Dijkstra algorithm.Firstly,the shortest path from DG node to important load node is found out by using Dijkstra algorithm.On meeting the constraint condition of islanded partition,the paths containing important loads are preferentially incorporated into island.Secondly,under satisfying safety and stability operation of island,more loads are incorporated into island gradually based on adjacent relation and load priority of the obtained islands.The proposed method can give full play to power supply capability of DG and has a good searching ability;it not only ensures power supply of the important load to maximum extent,but also considers the function of connective switch.Finally,the example analysis shows that the proposed method can solve the problem of distribution system island partition effectively.

关键词

孤岛划分/Dijkstra算法/最短路径/配电网/分布式电源

Key words

optimal island partition/Dijkstra algorithm/the shortest path/distribution system/distributed generation

引用本文复制引用

姚玉海,张璇,齐伟强,张岩..基于Dijkstra算法的配电网孤岛划分[J].电力系统保护与控制,2017,45(24):36-43,8.

基金项目

国家电网公司科技项目资助(沈阳供电公司信息化工作办公室KJ[2013] 896) (沈阳供电公司信息化工作办公室KJ[2013] 896)

电力系统保护与控制

OA北大核心CSCDCSTPCD

1674-3415

访问量0
|
下载量0
段落导航相关论文