人民黄河2018,Vol.40Issue(3):25-28,33,5.DOI:10.3969/j.issn.1000-1379.2018.03.006
南一水库防洪调度模型研究
Research on Flood Control Operation Model of Nanyi Reservoir
冯胜男 1董增川 2杨光2
作者信息
- 1. 江苏省水文水资源勘测局,江苏 南京210029
- 2. 河海大学 水文水资源学院,江苏 南京210098
- 折叠
摘要
Abstract
It tried to build instruction scheduling model,level control scheduling model and peak compensation scheduling model of reservoir flood control. Of which,instruction scheduling model was easy to operate,specified discharge volume and focused on the protection of reser-voir itself. Level control scheduling model took the maximum peak shaving as the goal and controls the maximum stage and final stage during dispatching period. Peak compensation scheduling model put the safety of downstream flood control section in the first place. It took interval inflow into consideration for peak compensation scheduling and made full use of flood carrying capacity. Reservoir flood control operation in this article took the flood of Typhoon Usagi in 2013 as object of study and analyzed the scheduling results of different modes. The conclusion is given that the peak compensation scheduling model is more flexible compared to the others and it can guarantee not only the safety of the reservoir but also the safety of the reference section downstream.关键词
防洪/指令调度/水位控制/错峰补偿/南一水库Key words
flood control/instruction scheduling/level control scheduling/peak compensation scheduling/Nanyi Reservoir分类
建筑与水利引用本文复制引用
冯胜男,董增川,杨光..南一水库防洪调度模型研究[J].人民黄河,2018,40(3):25-28,33,5.