地铁盾构隧道下穿施工对简支梁桥安全性影响分析

杨丽明 沈宇鹏 汤天笑 王云超

铁道标准设计2018,Vol.62Issue(3):96-100,5.
铁道标准设计2018,Vol.62Issue(3):96-100,5.DOI:10.13238/j.issn.1004-2954.201703290002

地铁盾构隧道下穿施工对简支梁桥安全性影响分析

Security Analysis on Subway Shield Tunneling Passing under Simply Supported Girder Bridge

杨丽明 1沈宇鹏 2汤天笑 2王云超2

作者信息

  • 1. 北京市重大项目建设指挥部办公室,北京 100029
  • 2. 北京交通大学土木建筑工程学院,北京 100044
  • 折叠

摘要

Abstract

Due to soil excavation and the setting of pipe piece and second lining in shield tunneling,the initial state of the surrounding soil is influenced during the working process, which leads to uneven settlement and lateral displacement of the bridge superstructure and adversely affects the bridge's normal service. This Paper uses Midas/GTS software to establish the finite element model based on a shield tunneling project passing under an existing railway to analyze the settlement characteristics of piers and abutments. The results indicate that during the process of shield tunneling, the maximum settlement on the right line at the East No. 2-North pier (the 32ndconstruction step) is 6.8 mm; the maximum differential settlement after excavation between adjacent piers during the excavation on the right line of West 0-West 1,West1-West2,West2-East 2 piers(the 32ndconstruction step) is 2 mm. It is proposed that construction should meet the technical indicators:the total settlement of piers is less than 25 mm,the longitudinal differential settlement of adjacent piers is less than 2 mm,the lateral settlement of the same pier is less than 3mm and the horizontal displacement of piers is less than 3 mm.

关键词

地铁/下穿工程/盾构施工/变形/监控标准/数值计算

Key words

Subway/Under-passing engineering/Shield tunneling/Deformation/Monitoring standards/Numerical calculation

分类

交通工程

引用本文复制引用

杨丽明,沈宇鹏,汤天笑,王云超..地铁盾构隧道下穿施工对简支梁桥安全性影响分析[J].铁道标准设计,2018,62(3):96-100,5.

基金项目

中央高校基本科研业务费专项资金(2015JBM064) (2015JBM064)

铁道标准设计

OA北大核心

1004-2954

访问量0
|
下载量0
段落导航相关论文