| 注册
首页|期刊导航|铁道标准设计|铁路漏泄同轴电缆直流隔断器设置方案研究

铁路漏泄同轴电缆直流隔断器设置方案研究

刘立海

铁道标准设计2018,Vol.62Issue(3):144-148,5.
铁道标准设计2018,Vol.62Issue(3):144-148,5.DOI:10.13238/j.issn.1004-2954.201708110001

铁路漏泄同轴电缆直流隔断器设置方案研究

Study on the Setting Scheme of DC Breaker of Railway Leaky Coaxial Cable

刘立海1

作者信息

  • 1. 中铁第四勘察设计院集团有限公司,武汉 430063
  • 折叠

摘要

Abstract

To solve the problem of damages to DC breaker of leaky coaxial cable(LCX) due to improper setting and installation of DC breaker in electrified railways,setting schemes of DC breaker are studied. Firstly, the electrostatic induction voltage and electromagnetic induction voltage are calculated, and examples are presented. Secondly, the necessities and functions of DC breaker are analyzed. Finally, recommended setting scheme is proposed after comparison. One DC breaker is installed at one end of the LCX each every 500~750 meters to prevent DC and low frequency current from passing through the LCX and to avoid the electromagnetic induction of the LCX exceeding the limit specified in the corresponding standards. The other end is grounded to prevent and eliminate electrostatic induction for the protection of people and equipment.

关键词

电气化铁路/直流隔断器/漏泄同轴电缆/牵引网/静电感应/电磁感应

Key words

Electric railway/DC breaker/Leaky coaxial cable(LCX)/Traction network/Electrostatic induction/Electromagnetic induction

分类

交通工程

引用本文复制引用

刘立海..铁路漏泄同轴电缆直流隔断器设置方案研究[J].铁道标准设计,2018,62(3):144-148,5.

基金项目

国家重点研发计划(2016YFB1200100) (2016YFB1200100)

铁道部科技研究开发计划(铁建科字(2012)-8) (铁建科字(2012)

铁道标准设计

OA北大核心

1004-2954

访问量0
|
下载量0
段落导航相关论文