摘要

Abstract

With the rapid development of new energy generation,the consumption of new energy has been faced with severe situation in partial areas in China recently.In this study,key initiatives have been put forward to promote large-scale new energy domestic consumption in the 13th Five-Year Plan period through the design of power supply side,grid side,load side and market mechanism based on in-depth analysis of present status and principal problem of new energy consumption in China.Through multiscenario analysis and time-sequential power system production simulation of new energy consumptive ability,contributions of different measures to possible consumption improvement are analyzed.Existing uncertainty in new energy consumption is also analyzed.Key initiatives for promoting joint efforts of all parties are proposed to stimulate consumption,aiming at keeping wind and ohotovoltaic power curtailment within 5% boundary.

关键词

新能源/消纳/弃风/弃光/时序生产模拟法

Key words

new energy/energy consumption/wind power curtailment/photovoltaic power curtailment/time-sequential power system production simulation

分类

信息技术与安全科学

引用本文复制引用

张正陵..中国“十三五”新能源并网消纳形势、对策研究及多情景运行模拟分析[J].中国电力,2018,51(1):1-9,9.

基金项目

国家电网公司科技项目(SGSNKY00KJJS1600289).This work is supported by Science and Technology Project of State Grid Corporation of China (No.SGSNKY00KJJS1600289). (SGSNKY00KJJS1600289)