Research and application of staged dynamic controlling domain of limited reservoir water level in flood season based on the improved pre-discharge capacity constrained method

任明磊 1何晓燕 2丁留谦 1王海军 2李辉 1谭亚男2

作者信息

  • 1. 中国水利水电科学研究院,北京100038
  • 2. 水利部防洪抗旱减灾工程技术研究中心,北京 100038
  • 折叠

摘要

Abstract

Dynamic controlling domain of limited reservoir water level in flood season is the key content of the research of dynamic control of limited reservoir water level in flood season,and also is the foundation of implementing the scheme for dynamic controlling.Pre-discharge capacity constrained method is the main method for determining the dynamic controlling domain of limited reservoir water level in flood season,however,this method mainly considers flood forecasting information in the procedure of pre-storage and pre-discharge,and does not applicable for the reservoirs with short flow concentration time and low accuracy of flood forecasting scheme.Therefore,this paper proposes the improved pre-discharge capacity constrained method which considers 48-hours rainfall forecasting information,and studies on the determining method of staged dynamic control domain of limited reservoir water level in flood season.On the basis of the method,Zhangze Reservoir in Shanxi province is considered as engineering background,and by combining with existing staged limited reservoir water level in flood season,the improved pre-discharge capacity constrained method is adopted to determine the staged dynamic control domain of limited reservoir water level in flood season for Zhangze Reservoir.The achievement has been approved by the Haihe River Water Conservancy Commission,and achieved preferable application result in the practice of reservoir operation of 2013,2014,2015 and 2016.

关键词

改进预泄能力约束/汛限水位动态控制域/分期

Key words

improved pre-discharge capacity constrained method/dynamic controlling domain of limited reservoir water level in flood season/staged flood season

分类

水利科学

引用本文复制引用

任明磊,何晓燕,丁留谦,王海军,李辉,谭亚男..基于改进预泄能力约束法的水库汛限水位分期动态控制域确定及应用[J].中国水利水电科学研究院学报,2018,16(1):16-22,7.

基金项目

国家自然科学基金青年基金项目(51509268) (51509268)

中国水利水电科学研究院科研专项(JZ0145B022017) (JZ0145B022017)

中国水利水电科学研究院学报

OA北大核心CSTPCD

2097-096X

访问量0
|
下载量0
段落导航相关论文