| 注册
首页|期刊导航|长江科学院院报|基于多元利益的溪洛渡、向家坝水电站调度管理探索与实践

基于多元利益的溪洛渡、向家坝水电站调度管理探索与实践

喻啸 刘志武

长江科学院院报2018,Vol.35Issue(1):151-154,4.
长江科学院院报2018,Vol.35Issue(1):151-154,4.DOI:10.11988/ckyyb.20160845

基于多元利益的溪洛渡、向家坝水电站调度管理探索与实践

Dispatching Management of Xiluodu and Xiangjiaba Hydropower Stations Based on Multi-interest Pattern: Exploration and Practice

喻啸 1刘志武1

作者信息

  • 1. 中国长江三峡集团公司,北京 100038
  • 折叠

摘要

Abstract

Located in the lower reach of Jinsha River,Xiluodu hydropower station and Xiangjiaba hydropower station are two backbone stations of "West-to-East Power Transmission" in China.The dispatching management of these two stations involves multi-parties of interest,such as industries of flood control,power generation,shipping,irrigation,environmental protection,and regions in East China,South China,Sichuan Province and Yunnan Province etc.The coordination of dispatching is difficult with no successful example to follow.On the basis of analyzing the demands of multiple parts of interest,this paper makes preliminary exploration and practice on modem dispatching management of hydropower stations in five aspects:being practical and realistic,perfecting laws and regulations,offering effective technology methods,establishing coordination mechanism,and strengthening policy support.This research is expected to provide reference for the scientific dispatching and the optimum comprehensive benefits of hydropower stations.

关键词

调度管理/多元利益/溪洛渡水电站/向家坝水电站/探索实践

Key words

dispatching management/multi-interest/Xiluodu hydropower station/Xiangjiaba hydropower station/exploration and practice

分类

建筑与水利

引用本文复制引用

喻啸,刘志武..基于多元利益的溪洛渡、向家坝水电站调度管理探索与实践[J].长江科学院院报,2018,35(1):151-154,4.

长江科学院院报

OA北大核心CSCDCSTPCD

1001-5485

访问量0
|
下载量0
段落导航相关论文