| 注册
首页|期刊导航|广东电力|珠三角电网目标网架研究

珠三角电网目标网架研究

杨燕 林勇 左郑敏 徐蔚

广东电力2017,Vol.30Issue(12):62-69,8.
广东电力2017,Vol.30Issue(12):62-69,8.DOI:10.3969/j.issn.1007-290X.2017.012.010

珠三角电网目标网架研究

Research on Target Framework of Pearl River Delta Power Grids

杨燕 1林勇 1左郑敏 1徐蔚1

作者信息

  • 1. 广东电网发展研究院有限责任公司,广东广州510080
  • 折叠

摘要

Abstract

Pearl River Delta power grids have characteristics of high load density,multi-DC feed-in and complicated framework structure,and there are problems such as excessive short-circuit current,AC/DC interaction,insufficient risk control ability,and so on.Therefore,the paper proposes to construct the target framework of Pearl River Delta power grids by taking a form of partition interconnection.Specific construction of the target framework includes 500 kV AC weak connection,1 000 kV ultra-high voltage AC and asynchronous interconnection.It also analyzes influence of partition scale and connection types on safety performance of Pearl River Delta power grids by simulating and results indicate asynchronous interconnection has advantage in fault isolation and promoting controllability of the system.

关键词

珠三角电网/目标网架/分区互联/柔性直流

Key words

Pearl River Delta power grid/target framework/partition interconnection/flexible HVDC

分类

信息技术与安全科学

引用本文复制引用

杨燕,林勇,左郑敏,徐蔚..珠三角电网目标网架研究[J].广东电力,2017,30(12):62-69,8.

基金项目

广东电网有限责任公司电力规划专题研究项目(030000QQ17001) (030000QQ17001)

广东电力

OACSTPCD

1007-290X

访问量0
|
下载量0
段落导航相关论文