广东电力2017,Vol.30Issue(12):62-69,8.DOI:10.3969/j.issn.1007-290X.2017.012.010
珠三角电网目标网架研究
Research on Target Framework of Pearl River Delta Power Grids
摘要
Abstract
Pearl River Delta power grids have characteristics of high load density,multi-DC feed-in and complicated framework structure,and there are problems such as excessive short-circuit current,AC/DC interaction,insufficient risk control ability,and so on.Therefore,the paper proposes to construct the target framework of Pearl River Delta power grids by taking a form of partition interconnection.Specific construction of the target framework includes 500 kV AC weak connection,1 000 kV ultra-high voltage AC and asynchronous interconnection.It also analyzes influence of partition scale and connection types on safety performance of Pearl River Delta power grids by simulating and results indicate asynchronous interconnection has advantage in fault isolation and promoting controllability of the system.关键词
珠三角电网/目标网架/分区互联/柔性直流Key words
Pearl River Delta power grid/target framework/partition interconnection/flexible HVDC分类
信息技术与安全科学引用本文复制引用
杨燕,林勇,左郑敏,徐蔚..珠三角电网目标网架研究[J].广东电力,2017,30(12):62-69,8.基金项目
广东电网有限责任公司电力规划专题研究项目(030000QQ17001) (030000QQ17001)