流体机械2018,Vol.46Issue(3):47-51,16,6.DOI:10.3969/j.issn.1005-0329.2018.03.010
5500 m3高炉配备鼓风机的扩容升级设计
Design of 5500 m3Blast Furnace with Blower Capacity Expansion and Upgrading Project
梁高林 1吴礼云 1凌晨 1刘爱军 1高剑波1
作者信息
- 1. 首钢京唐钢铁联合有限责任公司,河北唐山 063200
- 折叠
摘要
Abstract
The technical difficulties in the upgrading and reconstruction of large blower was analyzed. Redesigned model, static blades,optimize the relationship between series and,to ensure the reasonable tip Mach number and leaf size,to maximize the benefit of old original equipment. Using artificial neural network and numerical optimization algorithm combining the theory of flow field optimization,solving the key and difficult problems,ensure that after the transformation of the fan meet blast furnace,big volume,high pressure air supply demand,saving to purchase a new machine,a lot of money.关键词
高炉鼓风机/利旧扩容改造/叶型优化Key words
blast furnace blower/the old capacity expansion/the optimization of the leaf type分类
机械制造引用本文复制引用
梁高林,吴礼云,凌晨,刘爱军,高剑波..5500 m3高炉配备鼓风机的扩容升级设计[J].流体机械,2018,46(3):47-51,16,6.