北京交通大学学报2018,Vol.42Issue(1):62-68,7.DOI:10.11860/j.issn.1673-0291.2018.01.009
天然气联合循环电厂CO2捕获整体性能及成本敏感性分析
Performance and cost sensitivity analysis of natural gas combined cycle power plant integrated with CO2 capture
摘要
Abstract
The overall plant performance and costs of the Natural Gas Combined Cycle (NGCC) power plant fitted with post-combustion CO2 Capture (NGCC+CC)based on Monoethanolamine (MEA) and a no capture power plant are estimated by Integrating Environmental Control Model (IECM) and comparing with pulverised coal-fired power plant with Post-Combustion CO2 Capture (PC + CC)with equal power generation.Meanwhile,the key indexes such as the Levelized Cost of Electricity (LCOE),CO2 capture cost and sorbent regeneration energy consumption are analyzed by using sensitivity analysis method to optimize main operating parameters.The results show that the overall efficiency of NGCC power plane decreases because of the CO2capture system after the combustion of MEA sorbent with its efficiency penalty reaching 6.92 %so that LCOE increases from 896(¥)/MWh to 1020(¥)/MWh.However,the efficiency penalty of PC+CC power plant is 4%.Moreover,the natural gas price and capacity factor of NGCC power plant are more sensitive to the LCOE,especially the natural gas price.The capacity factor,the price of natural gas and CO2 removal rate and other factors have an impact on the CO2 capture cost of NGCC+CC power plant and the sorbent regeneration energy consumption is affected mainly by sorbent concentration,steam heat content,lean solution loading,liquid to-gas ratio and thermoelectric efficiency.关键词
天然气联合循环电厂/整合环境控制模型/燃烧后CO2捕获/电厂整体性能/敏感性分析Key words
NGCC power plant/IECM/post combustion CO2 capture/overall plant performance/sensitivity analysis分类
信息技术与安全科学引用本文复制引用
敬朝文,李进,黄忠源..天然气联合循环电厂CO2捕获整体性能及成本敏感性分析[J].北京交通大学学报,2018,42(1):62-68,7.基金项目
国际合作项目(C12F00010) International Cooperation Project(C12F00010) (C12F00010)