基于年防洪标准的水库分期优化调度研究

Research on optimized reservoir staged operation based on annual flood control standard

张涛 1蔡振华 2刘英豪 1于东平1

作者信息

  • 1. 山东省水利勘测设计院,山东济南250013
  • 2. 山东省水文水资源勘测局,山东济南250014
  • 折叠

摘要

Abstract

Taking Mianhuatan reservoir as an example,staged optimization operation without reducing annual flood control standard is implemented.Traditional hydrological frequency method is used to calculate stage design flood,and probability combination should be consistent with annual flood probability.Two variable sequences between staged design flood control capacity and frequency are established.The flood risk is calculated according to flood control capacity under staged limited water level.Under the premise that risk combination satisfied annual flood control standard,long series simulation is conducted based on power generation and flood regulation rules,to seek great overall benefit by transferring stage's risk and benefit.The results show that,limited water level in main and secondary flood season is 168.78 m and 169.58m respectively,flood risk rate is namely 1.217% and 0.783%,whose combination risk ratio is 1.99%,consistent with annual flood control standard 2%,and has greate benefit.

关键词

汛限水位/分期调度/概率组合/长系列模拟/风险效益转移/效益最大化

Key words

limited water level/staged operation/probability combination/long series simulation/risk -benefit transfer/maximum benefit

分类

建筑与水利

引用本文复制引用

张涛,蔡振华,刘英豪,于东平..基于年防洪标准的水库分期优化调度研究[J].水资源与水工程学报,2018,29(1):128-133,6.

基金项目

水利部公益性行业科研专项(201501054) (201501054)