引汉济渭工程调水区水库群调水模式研究

杜小洲 白涛 马旭 武连洲 黄强

水利水电技术2017,Vol.48Issue(8):2-7,136,7.
水利水电技术2017,Vol.48Issue(8):2-7,136,7.DOI:10.13928/j.cnki.wrahe.2017.08.001

引汉济渭工程调水区水库群调水模式研究

Study on water transfer mode of reservoir group within water-transferring region for Hanjiang-to-Weihe River Valley Water Diversion Project

杜小洲 1白涛 2马旭 1武连洲 1黄强1

作者信息

  • 1. 西安理工大学西北旱区生态水利工程国家重点实验室,陕西西安710048
  • 2. 陕西省引汉济渭工程建设有限责任公司,陕西西安710010
  • 折叠

摘要

Abstract

Hanjiang-to-Weihe River Valley Water Diversion Project is one of the important measures to alleviate the water shortage in Guanzhong Area and improve the ecology of Weihe River.The total water transfer amount and the water transfer benefit of the project are directly decided by the water transfer modes of Huangjinxia and Sanhekou reservoir group and pumping station group.Taking the yearly average water transfer amount of 1.5 billion m3 as the target,two water transfer modes,i.e.transferring water from Huangjinxia Reservoir at first and then additionally transferring water from Sanhekou Reservoir,and transferring water from Sanhekou Reservoir and then additionally transferring water from Huangjinxia Reservoir,are made up.Through a long series calculation,the evaluation indexes of all the items of the total water transfer amount,energy consumption of pumping station,power generation of hydropower station,etc.under different water transfer modes are compared.The study result shows that under the operation condition of transferring water from Huangjinxia Reservoir at first and then additionally transferring water from Sanhekou Reservoir,the water amount of 1.555 billion m3 can be transferred through Hanjiang-to-Weihe River Valley Water Diversion Project with the total cascade power generation of 0.553 billion kW · h and the total cascade energy consumption of 0.491 billion kW · h,for which the net power generation is positive,while under the operation condition of transferring water from Sanhekou Reservoir and then additionally transferring water from Huangjinxia Reservoir,the water amount of 1.445 billion m3 can be transferred through Hanjiang-to-Weihe River Valley Water Diversion Project with the total cascade power generation of 0.624 billion kW · h and the total cascade energy consumption of 1.086 billion kW · h,for which the net power generation is negative.The study result has an important reference value for the operation of Hanjiang-to-Weihe River Valley Water Diversion Project.

关键词

调水模式/水库群/调水效益/引汉济渭工程

Key words

water transfer mode/reservoir group/water transfer benefit/Hanjiang-to-Weihe River Valley Water Diversion Project

分类

建筑与水利

引用本文复制引用

杜小洲,白涛,马旭,武连洲,黄强..引汉济渭工程调水区水库群调水模式研究[J].水利水电技术,2017,48(8):2-7,136,7.

基金项目

国家自然科学基金(51409210,91325201) (51409210,91325201)

水利公益性行业科研专项经费项目(201501058) (201501058)

陕西省水利科技计划项目(2016slkj-8) (2016slkj-8)

水利水电技术

OA北大核心CSCDCSTPCD

1000-0860

访问量0
|
下载量0
段落导航相关论文