Hanjiang-to-Weihe River Valley Water Diversion Project is the key project to solve the water resources problem in Shaanxi province,for which two pumping stations,two hydropower stations and a main water conveyance line for diverting water from Hanjiang River to Guangzhong Area are planned.The general layout is an important technical problem for the project.On the basis of the general planning of the project,the correlations among all the composed parts of the project are studied herein according to the demand from Guanzhong Water-Receiving Area on the project,so as to get the target of optimizing the project layout,coordinating the link-ups among all parts of the project and forming a reasonable and effective scheme for the water transfer system.Under a comprehensive consideration of the influences from several factors on the site selection and layout of the project,the relevant alternatives are taken into account for the consideration of the general scheme from the aspect of the systemization of the project through the analysis and study concerned,and then the demonstration of the site selection,selection of the water conveyance line and the coordination of the link-up relationships for the project are completed through the economic and technical comparisons made on several schemes in accordance with the specific characteristics of the project.Meanwhile,the gradient of the water conveyance tunnel is demonstrated through the relevant method of engineering economics.Finally,the effects from both the site selection and the general layout of the project to be obtained are analyzed,furthermore,the problems those must be paid attention to during the implementation of the project are put forward as well.

关键词

引汉济渭工程/工程选址/总体布置/黄金峡水库/三河口水利枢纽/秦岭隧洞

Key words

Hanjiang-to-Weihe River Valley Water Diversion Project/site selection/general layout/Huangjinxia Reservoir/Sanhekou Water Control Project/Qinling Tunnel