水利水电技术2017,Vol.48Issue(8):36-39,4.DOI:10.13928/j.cnki.wrahe.2017.08.007
三河口水利枢纽厂房联合布置
Study on joint-layout for powerhouse of Sanhekou Water Control Project
郑湘文 1毛拥政 1张俊雅1
作者信息
- 1. 陕西省水利电力勘测设计研究院,陕西西安710100
- 折叠
摘要
Abstract
In accordance with requirements from the tasks of water supply,water regulation and storage and power generation,the powerhouse of Sanhekou Water Control Project is necessary to be assembled with reversible pump-turbine,conventional hydraulic turbine and pressure/flow regulating valve.In order to reasonably place them in the powerhouse,the scheme of placing the reversible pump-turbine,the conventional hydraulic turbine and the water supply valve in one powerhouse is selected through the study made on the type selection of the turbine units and the pressure/flow regulating valve as well as the analysis made on the operation characteristics of this project and the operation condition of the reversible pump-turbine.This scheme has the characteristics of reduced project investment,enhanced efficiency of the turbine unit,convenient operation and management,increased flexibility of water transfer,etc.,thus can provide references for the similar projects concerned.关键词
三河口水利枢纽/厂房/水泵水轮机/水轮机/减压调流阀/联合布置Key words
San Hekou Water Control Project/powerhouse/pump-turbine/hydraulic turbine/pressure/flow regulating valve/joint-layout分类
建筑与水利引用本文复制引用
郑湘文,毛拥政,张俊雅..三河口水利枢纽厂房联合布置[J].水利水电技术,2017,48(8):36-39,4.