基于时间测距的矿井人员定位方法研究

孙哲星

工矿自动化2018,Vol.44Issue(4):30-33,4.
工矿自动化2018,Vol.44Issue(4):30-33,4.DOI:10.13272/j.issn.1671-251x.17297

基于时间测距的矿井人员定位方法研究

Research on mine personnel positioning method based on time range

孙哲星1

作者信息

  • 1. 中国矿业大学(北京)机电与信息工程学院,北京 100083;中国建设银行股份有限公司北京数据中心,北京100068
  • 折叠

摘要

Abstract

Four kinds of mine personnel positioning methods based on time range were researched,namely TOA,TWR,SDS-TWR and TDOA positioning methods,they are less influenced by roadway environment and suitable for mine personnel precise positioning.TOA positioning method requires time of transmitting device and receiving device must be strictly and accurately synchronized,clock accuracy requirement of transmitting device and receiving device is very high with synchronous calibration,so its positioning card and substation cost high.TWR positioning method does not need to strictly synchronize in clock of signal transmitting device and receiving device,so complexity and cost of its positioning system is reduced,but its positioning precision is affected by clock error of positioning card and substations,positioning card and substation cost high.SDS-TWR positioning method does not need to strictly synchronize in clock of signal transmitting device and receiving device,so influence of clock error of its positioning substation and card on positioning precision is reduced,but its positioning precision is affected by clock error of positioning card and substations,positioning card and substation cost high.TDOA positioning method requires time between positioning substations must be strictly and accurately synchronized,and clock accuracy requirement of positioning substations is very high with synchronous calibration,positioning card cost lower and positioning substation cost higher.

关键词

矿井通信/人员定位/精确定位/时间测距/TOA/TDOA/TWR/SDS-TWR

Key words

mine communication/personnel positioning/accurate positioning/time range/TOA/TDOA/TWR/SDS-TWR

分类

矿业与冶金

引用本文复制引用

孙哲星..基于时间测距的矿井人员定位方法研究[J].工矿自动化,2018,44(4):30-33,4.

基金项目

国家重点研发计划资助项目(2016YFC0801800) (2016YFC0801800)

国家自然科学基金重点资助项目(51134024) (51134024)

国家高技术研究发展计划(863计划)资助项目(2012AA0622031). (863计划)

工矿自动化

OA北大核心CSTPCD

1671-251X

访问量0
|
下载量0
段落导航相关论文