水力发电2018,Vol.44Issue(4):37-41,56,6.
考虑水流滞时影响的梯级水电战群短期优化调度研究
Short-term Optimal Operation of Cascade Hydropower Stations Considering the Delay of Flow Propagation
摘要
Abstract
To solve the problem of unbalance in water quantity during scheduling period of short-term unified optimal operation of cascade reservoirs,a short-term unified optimization model considering the influence of flow delay time is put forward.The scheduling period affected by the flow delay time is divided into three parts:the part affected by the previous scheduling period,the part affected by this scheduling period,and the part affecting the next scheduling period.On this basis,a block resolution method based on POA is adopted.A case study of Pubugou Hydropower Station and its following cascade hydropower stations in Dadu River is carried out for its validation.The results show that the proposed method can effectively deal with the difficulty of calculating caused by the flow delay time,and can better reflect the generation benefit of the scheduling period affected by flow delay time.The method is simple and practical.关键词
短期优化调度/POA/滞时/分块求解/梯级电站/大渡河Key words
short-term optimal operation/POA/delay time/block solving/cascade power station/Dadu River分类
建筑与水利引用本文复制引用
肖贵友,陈仕军,李基栋,邹祖建,马光文..考虑水流滞时影响的梯级水电战群短期优化调度研究[J].水力发电,2018,44(4):37-41,56,6.基金项目
国家重点研发计划(2016YFC0402205 ()
2016YFC0402208) ()
国家电网公司总部科技项目“西南电网雅砻江风光水互补优化调度策略研究”(SGSCDK00XTJS1700047) (SGSCDK00XTJS1700047)