水力发电2018,Vol.44Issue(4):92-95,4.
基于成本最优的抽水蓄能电站参与系统调峰调用顺序研究
Study on Order of Pumped-storage Power Station in Participating System Peak Regulation Based on Optimal Comprehensive Cost
张晋芳 1元博 1樊玉林 2王晓晨 1栗楠 1徐志成 1冯君淑1
作者信息
- 1. 国网能源研究院有限公司,北京102209
- 2. 国网新源控股有限公司技术中心,北京100761
- 折叠
摘要
Abstract
For studying the calling sequence of pumped-storage power stations and other conventional power sources in participating peak regulation of power system,the concepts including continuous ramping events and unit adjustment capacity cost are cleared,and then a comprehensive cost optimization model for determining the adjustment order of different peakregulating measures is proposed.The example calculation shows that the method can effectively realize the sorting of many kinds of peak-regulating measures in power system,and the calling order of pumped-storage power stations is necessary to combine with the specific conditions of power system.关键词
抽水蓄能/连续爬坡事件/调峰顺序/单位调节容量成本Key words
pumped storage/continuous ramping event/peak regulating order/unit adjustment capacity cost分类
能源科技引用本文复制引用
张晋芳,元博,樊玉林,王晓晨,栗楠,徐志成,冯君淑..基于成本最优的抽水蓄能电站参与系统调峰调用顺序研究[J].水力发电,2018,44(4):92-95,4.