| 注册
首页|期刊导航|岩土力学|滑体段采用m法模型的抗滑桩计算方法

滑体段采用m法模型的抗滑桩计算方法

毛坚强 徐骏 杨磊

岩土力学2018,Vol.39Issue(4):1197-1202,6.
岩土力学2018,Vol.39Issue(4):1197-1202,6.DOI:10.16285/j.rsm.2016.0993

滑体段采用m法模型的抗滑桩计算方法

An improved method for stabilising pile by using m-method model to the whole pile

毛坚强 1徐骏 2杨磊1

作者信息

  • 1. 西南交通大学 土木工程学院,四川 成都 610031
  • 2. 中国中铁二院工程集团有限责任公司科学技术研究院,四川 成都 610031
  • 折叠

摘要

Abstract

For the existing calculation methods for the stabilising pile,the interaction between pile and landslide body is simplified as the determined load.However,these methods all ignore the direct dependence of the interaction on the displacement of the pile.This study developed a method,in which m-method model was employed to simulate the interaction between landslide body and pile.Meanwhile,equations were established for the piles above and below the slip surface respectively,and their expressions of displacement and internal force were also solved with power series method.Meanwhile,the bending moment and shear force at the slip surface were obtained by using deformation coordinating conditions of the upper and lower piles at the sliding surface.Hence,the deformation,internal force of the pile and the interaction between pile and landslide body were easily computed.Finally,an example was calculated by the presented method and FEM,respectively.It was found that results were in good agreement,which verified the correctness of the method.

关键词

抗滑桩/滑体/m法/幂级数法

Key words

stabilising pile/landslide body/m-method/power series method

分类

建筑与水利

引用本文复制引用

毛坚强,徐骏,杨磊..滑体段采用m法模型的抗滑桩计算方法[J].岩土力学,2018,39(4):1197-1202,6.

岩土力学

OA北大核心CSCDCSTPCD

1000-7598

访问量3
|
下载量0
段落导航相关论文