电力建设2018,Vol.39Issue(2):30-35,6.DOI:10.3969/j.issn.1000-7229.2018.02.004
大型异步互联电网中送端电网频率偏差峰值计算
Frequency Deviation Peak Calculation of Sending-End Network in Large Asynchronous Interconnected Power Grid
陈义宣 1郭相阳 2李玲芳 1朱欣春 1徐政2
作者信息
- 1. 云南电网有限责任公司电网规划研究中心,昆明市 650011
- 2. 浙江大学电气工程学院,杭州市 310027
- 折叠
摘要
Abstract
The power angle stability of the large area power grid is improved through the HVDC asynchronous connection.But on the side of the sending-end,the DC fault makes the frequency of gird increase,which will cause frequency stabilization problem.The frequency deviation peak is an important index in the study of the power grid frequency stability.The method of calculating the frequency deviation peak based on the rate of the frequency deviation is obtained from the single machine model.Then,the method is expanded to the actual power system and the application of the method in the HVDC additional control and generator-tripping is studied.Finally,a single machine model and Yunnan Power Grid are simulated to verify the method.The results show that the frequency deviation peak method based on frequency deviation rate is accurate and can be applied to the actual power grid,which has the practical value of engineering.关键词
频率偏差峰值/异步互联电网/送端电网/功角稳定/稳控切机/直流附加控制Key words
frequency deviation peak/asynchronous interconnected power grid/sending-end power grid/angle stability/generator-tripping/HVDC supplementary control分类
信息技术与安全科学引用本文复制引用
陈义宣,郭相阳,李玲芳,朱欣春,徐政..大型异步互联电网中送端电网频率偏差峰值计算[J].电力建设,2018,39(2):30-35,6.