摘要
Abstract
The type characteristics of layout configuration of the production system are presented, the series structure and parallel structure are research object, and the performance difference of the layout configuration of the production sys-tem is studied based on the different processing time distribution. The processing time is calculated according to the normal distribution with the same parts numbers. The simulation results show that the configuration performance changes when the production line in two work processing time from the normal distribution n (12, 1), the others all obey n (10, 1) change to n (12, 10). The analysis shows that the layout configuration performance shows the difference with the change of the distribu-tion of time distribution when the total number of parts and the number of parts per phase are unchanged; the processing time of workplace is an important factor to affect the performance of production system.关键词
生产线性能/布局构形/工作地处理时间/仿真Key words
product line performance/layout configuration/processing time of workplace/simulation分类
管理科学引用本文复制引用
吕超,刘爽,申玉..基于工作地处理时间的生产线布局构形性能分析与研究[J].工程研究-跨学科视野中的工程,2018,10(2):186-191,6.基金项目
上海交通大学海洋工程国家重点实验室基金项目(1512,1303) (1512,1303)
上海市优秀学科带头人计划(B类)资助项目(14XD1424300) (B类)
上海海洋大学科技发展专项基金项目(2015) (2015)