煤田地质与勘探2018,Vol.46Issue(2):54-60,7.DOI:10.3969/j.issn.1001-1986.2018.02.009
断煤交线求解方法研究
Research on a method to solve intersection line of faulted coal seam
摘要
Abstract
In allusion to subjectivity and inaccuracy of intersection line of faulted coal seam by connecting the fault control points directly,according to the V-like rule,a method of Boolean intersection operation on fault surface and the trend of coal seam was put forward to get the intersection line of faulted coal seam.On the basis of the fault control points and fault lines data,the fault surface model was built.On the basis of quadratic polynomial model,index model,the Gompertz model,coal seam section curve on the edge of the faults was extended in terms of trend of coal seam,coal seam trend surface model was built.Through Boolean intersection operation on fault surface model and coal seam trend surface model,the intersection line of fault coal seam by the constraint fault surface together with coal seam trend surface was got.Compared with the intersection line of faulted coal seam by connecting the fault control points directly,the results showed that the intersection line of faulted coal seam by the constraint fault surface together with coal seam trend surface fully considers the trend of coal seam on faults,more veritable responses space form of intersection line of faulted coal seam,it has important theoretical and practical significance in the aspects of establishing solid models of coal seam and guiding the actual production.关键词
断煤交线/断层面/趋势延伸/布尔运算Key words
intersection line of fault coal seam/fault surface/trend extension/Boolean operation分类
矿业与冶金引用本文复制引用
刘光伟,宋佳琛,白润才,李鹏..断煤交线求解方法研究[J].煤田地质与勘探,2018,46(2):54-60,7.基金项目
国家自然科学基金项目(51304104) (51304104)
辽宁省煤炭资源安全开采与洁净利用工程研究中心开放基金项目(TU15KF07) (TU15KF07)
National Natural Science Foundation of China(51304104) (51304104)
Liaoning Province Coal Resources Safety and Clean Utilization Engineering Research Center Open Fund Project(TU15KF07) (TU15KF07)