| 注册
首页|期刊导航|水利水电技术|Kokhav Hayarden抽水蓄能电站上、下库坝坡抗震稳定分析

Kokhav Hayarden抽水蓄能电站上、下库坝坡抗震稳定分析

李红军 徐辉 赵剑明

水利水电技术2018,Vol.49Issue(4):27-32,6.
水利水电技术2018,Vol.49Issue(4):27-32,6.DOI:10.13928/j.cnki.wrahe.2018.04.004

Kokhav Hayarden抽水蓄能电站上、下库坝坡抗震稳定分析

Seismic stability analysis on dam slopes of upper and lower reservoirs for Kokhav Hayarden Pumped Storage Hydropower Station

李红军 1徐辉 2赵剑明1

作者信息

  • 1. 中国水利水电科学研究院,北京 100048
  • 2. 中国电建集团华东勘测设计研究院有限公司,浙江 杭州 311122
  • 折叠

摘要

Abstract

According to the relevant requirements of international hydropower project,a seismic stability analysis is made on the dam slopes of both the upper and the lower reservoirs for Kokhav Hayarden Pumped Storage Hydropower Station in Israel.The peak value of acceleration,the design response spectrum of acceleration and the time-history input acceleration of the dam foundation surface upon a deep overburden are determined with the latest Israeli regulations SI413-2013 (English Version) for seismic design,and then the seismic safeties of the dam slopes of both the upper and the lower reservoirs built on a deep overburden under the conditions of the operational earthquake and the maximum design earthquake are rechecked with three normally used pseudo-static methods and the pseudo-dynamic method (i.e.Newmark sliding block method) recommended by the American Standard ASCE 7-05 and ICOLD,etc.It is known from the calculations on the factor of safety and the seismic sliding displace-ment under the conditions of various allowable sliding displacements that the dam slopes of both the upper and the lower reservoirs of Kokhav Hayarden Pumped Storage Hydropower Station can meet the engineering safety requirement of that the dam slope displacement under the operating basis earthquake (OBE) is less that 5 cm,thus the seismic designs of the dam slopes meet the specified requirements and the dam slopes of both the upper and the lower reservoirs have better seismic stabilities under the conditions of the operating basis earthquake (OBE) and the maximum design earthquake (MDE).The study result has an important referential value for the seismic design and safety assessment of the slope of earth-rockfill dam built on deep overburden in the international project concerned.

关键词

抽水蓄能电站/拟静力法/拟动力法/安全系数/地震滑动位移

Key words

Kokhav Hayarden Pumped Storage Hydropower Station/pseudo-static method/pseudo-dynamic method/factor of safety/seismic sliding displacement

分类

水利科学

引用本文复制引用

李红军,徐辉,赵剑明..Kokhav Hayarden抽水蓄能电站上、下库坝坡抗震稳定分析[J].水利水电技术,2018,49(4):27-32,6.

基金项目

国家自然科学基金项目(51509272) (51509272)

水利部公益性行业科研专项经费项目(201501035) (201501035)

中国水利水电科学研究院青年专项(GE0145B112016) (GE0145B112016)

国家重点研发计划(2017YFC0404904) (2017YFC0404904)

水利水电技术

OA北大核心CSTPCD

1000-0860

访问量0
|
下载量0
段落导航相关论文