铁道标准设计2018,Vol.62Issue(5):40-44,5.DOI:10.13238/j.issn.1004-2954.201706100003
城市中心区地铁联络线规划设计方案优化研究——以广州地铁11、13号线天河公园换乘站联络线为例
Optimization Research on Planning and Designing of Metro's Tie Line in Urban Center—A Case Study of Tie Line of Tianhe Park Station of Guangzhou Metro Line No.11 and No.13
马斌军1
作者信息
- 1. 中铁第一勘察设计院集团有限公司,西安 710043
- 折叠
摘要
Abstract
Tianhe Park Station of Guangzhou Metro Line No.11 and No.13 is located in Guangzhou urban center, where dense buildings, complex designing and construction conditions and higher environmental requirements greatly constrain the design of the tie line. Based on the analysis of the problems in the original tie line scheme, two optimization alternatives are put forward to increase the curve radius to adapt to the conditions of shield construction and to decrease the curve radius to reduce the gushing water and sand mining risk. Then a comprehensive analysis of designing scheme is conducted in terms of the line condition, surrounding environment, engineering risks and project investment. Finally,a tie line design scheme with a radius of 200 m is recommended. The research method and conclusions provide some references for the planning and design of metro tie line in urban center. The factors that should be taken into consideration in the planning and design of metro tie line in urban center are summarized to ensure that the final recommended engineering scheme is feasible.关键词
地铁联络线/城市中心区/环境/施工方法/曲线半径Key words
Metro Tie line/Urban center/Environment/Construction method/Curve radius分类
交通工程引用本文复制引用
马斌军..城市中心区地铁联络线规划设计方案优化研究——以广州地铁11、13号线天河公园换乘站联络线为例[J].铁道标准设计,2018,62(5):40-44,5.