运筹与管理2018,Vol.27Issue(4):22-28,7.DOI:10.12005/orms.2018.0080
基于模糊结构元的技术创新项目中止决策研究
Technological Innovation Project Termination Decision Based on Fuzzy Structured Element
摘要
Abstract
This paper introduces fuzzy mathematical theory based on structured element to technological innovation project evaluation and decision-mahing.On the basis of the reference points given by the decision maher,struc-tured elements are used to represent fuzzy information and the gains-losses values are calculated.Furthermore, considering the psychological behavioral factors of decision mahers,cumulative prospect theory is utilized to obtain fuzzy cumulative prospect value of each attribute with regard to different rish profile.With an integration method, the comprehensive cumulative prospect value of every project represented by structured element is acquired.On this basis,fuzzy ranhing is carried out to ranh and select projects with a proper weight function.Finally,an appli-cation example of the proposed method is provided to demonstrate its feasibility and effectiveness.关键词
技术创新项目/模糊结构元/累积前景理论/模糊排序Key words
technological innovation project/structured element/cumulative prospect theory/fuzzy ranhing method分类
管理科学引用本文复制引用
郭茜,张静,吴刚,付焯..基于模糊结构元的技术创新项目中止决策研究[J].运筹与管理,2018,27(4):22-28,7.基金项目
国家自然科学基金青年项目(71502147)国家社科基金(13BJY058)教育部人文社科基金(15YJA790064) (71502147)