基于WBS的水利工程建设项目投资管理与控制研究
Research on Investment Management and Control of Water Conservancy Construction Project Based on WBS
苏雨艳 1甘仲文 1何菁1
作者信息
- 1. 南京市水利建筑工程检测中心有限公司,江苏南京210036
- 折叠
摘要
Abstract
Water conservancy project investment control runs through the whole process of engineering construction,and it is an activity of ac-tively managing engineering economic indicators.The whole construction project is decomposed into various stages using WBS, the investment control objectives of each stage are integrated into the project investment control target,cost and progress of the whole process are analyzed syn-thetically by the method of EVM,the aim is to control investment in a timely manner and improve the investment benefit of the construction fund to the maximum extent,and complete the project construction on time,quality and quantity.关键词
工作分解结构/水利工程/全过程/投资控制/管理Key words
WBS/Water conservancy project/The whole process/Investment control/Management分类
农业科技引用本文复制引用
苏雨艳,甘仲文,何菁..基于WBS的水利工程建设项目投资管理与控制研究[J].安徽农业科学,2018,46(14):191-193,3.