地质论评2018,Vol.64Issue(3):753-763,11.DOI:10.16509/j.georeview.2018.03.019
目标规划在矿山地下水疏放管理中应用——以淮南潘北煤矿西翼采区为例
Goal Programming Application in Dewatering Management in Mine——a Case Study of the West Wing Mining Area of Panbei Coal Mine,Huainan,Anhui
摘要
Abstract
In the past, groundwater dewatering in mines lacked of scientific planning and management. This practice,however,has caused a great deal of groundwater resources wasted and a series of environmental geological problems occurred.The most effective solution to solve the conflict between groundwater drainage and conservation, is to optimize and distribute groundwater resources reasonably. Therefore, in this paper, taking the west wing mining area of Panbei Coal Mine in Huainan City as the research object,a goal programming management model is established by the optimization method, which based on the analysis of hydro-geological conditions and the construction of hydro-geological simulation models. The goal programming management model takes water level and dewatering volume as constraint conditions, and takes the minimum dewatering volume as the objective function. According to the optimal solution of the model,the drainage boreholes were redistributed and arranged in the study area. As a result,the mining time of coal seam A group in this area is shortened from 22 years to 5 years,and the total volume of required groundwater dewatering is decreased from 23126400 m3to 11942486 m3. The model proved to be correct and feasible by field practice. The method can also provide some guidance for groundwater drainage of mines which has similar conditions关键词
地下水疏放/目标规划/管理模型/响应矩阵法/水文地质模型/矿山Key words
Groundwater dewatering/goal programming/management model/response matrix method/hydro-geological model/mine引用本文复制引用
张海涛,许光泉,朱代双..目标规划在矿山地下水疏放管理中应用——以淮南潘北煤矿西翼采区为例[J].地质论评,2018,64(3):753-763,11.基金项目
本文为国家自然科学基金资助项目(编号:41572147)的成果.This study was finally supported by the National Natural Science Foundation of China(No.41572147). (编号:41572147)