广东电力2018,Vol.31Issue(5):56-63,8.DOI:10.3969/j.issn.1007-290X.2018.005.009
广东调峰电源调用序位研究
Research on Dispatching Order of Peak Load Regulation Power Source in Guangdong
摘要
Abstract
In order to satisfy requirements for policies of energy saving power generation dispatching,optimize operation of peak load regulation power source and improve peak load regulation ability of the power grid and absorption ability of clean energy,this paper offers a proposal for dispatching order of peak load regulation power source. In three aspects including operating characteristic of the unit,simulation on weekly peak load regulation operation of the power system and start-up and shut-down peak load regulation of the coal power unit,it aims at operation economy and benefits of energy consumption and emission reduction,and studies analysis method for dispatching order of peak load regulation power source. By means of comparing economic benefits and benefits of energy consumption and emission reduction acquired from matching nuclear power operation of start-up and shut-down peak load regulation of the coal power unit,southwest hydro-power and wind power operation,it studies relationship between consumptive ability of newly added clean energy electricity and clean energy types in the period of low load.关键词
调峰电源/调用序位/节能发电调度/节能减排/清洁能源Key words
peak load regulation power source/dispatching order/energy saving power generation dispatching/energy con-servation and emission reduction/clean energy分类
信息技术与安全科学引用本文复制引用
程鑫,卢洵,樊扬,曾凯文,林勇,项琰,杨燕..广东调峰电源调用序位研究[J].广东电力,2018,31(5):56-63,8.基金项目
广东电网有限责任公司重点规划项目(030000QQ 00170004) (030000QQ 00170004)