基于Leaderrank的高拱坝场内施工道路 复杂网络重要节点挖掘与分析
Node Mining and Analysis of Road Network in Construction of High Arch Dam Based on Leaderrank
摘要
Abstract
Construction road is a crucial factor to ensuring the construction of high arch dam project;however,con-struction road is often damaged because of complex environment and uncertain factors.In an attempt to restoring the function and transport intensity of the damaged road as soon as possible,a network model for internal construction road of a high arch dam containing twenty-three nodes is established as case study based on complex network theory in line with the characteristic of high arch dam's construction site.Leaderrank algorithm is employed for the mining and verification of important nodes of the road network.Node-failure mode verification results demonstrate that the node rank result accords with the actual project.The research could offer theoretical basis for road management and emergency maintenance of construction road for high arch dam.关键词
高拱坝/场内施工道路/复杂网络/小世界网络/Leaderrank/重要节点挖掘Key words
high arch dam/roads in construction site/complex network/small world network/leaderrank/impor- tant node mining分类
交通工程引用本文复制引用
黄建文,张一弛,袁华,黄敏,龚世柒,姜海龙..基于Leaderrank的高拱坝场内施工道路 复杂网络重要节点挖掘与分析[J].长江科学院院报,2018,35(6):135-140,6.基金项目
水库移民研究中心湖北省高校人文社科重点研究基地开放基金项目(2015KF01) (2015KF01)
湖北省自然科学基金面上项目(2014CFB670) (2014CFB670)
湖北省建设科技计划项目(KJ2016QT02) (KJ2016QT02)