| 注册
首页|期刊导航|水利水电技术|基于模糊综合评价法的大同市山洪灾害风险评价

基于模糊综合评价法的大同市山洪灾害风险评价

敬双怡 莘明亮 于玲红 李卫平 任波 黄立志

水利水电技术2018,Vol.49Issue(5):84-89,6.
水利水电技术2018,Vol.49Issue(5):84-89,6.DOI:10.13928/j.cnki.wrahe.2018.05.013

基于模糊综合评价法的大同市山洪灾害风险评价

Fuzzy comprehensive evaluation method-based risk assessment on mountain torrent disaster in Datong City

敬双怡 1莘明亮 1于玲红 1李卫平 1任波 2黄立志2

作者信息

  • 1. 内蒙古科技大学能源与环境学院,内蒙古包头014010
  • 2. 大同市水文水资源勘测分局,山西大同037300
  • 折叠

摘要

Abstract

Aiming at the insufficiency of the study on the risk assessment of the mountain torrent disaster in Datong City,a relevant risk assessment is made in combination with the advantages of the three methods,i.e.fuzzy comprehensive evaluation method,analytic hierarchy process and GIS.In accordance with the geographical environment and regional survey of Datong City,9 influencing factors,i.e.rainfall intensity,frequency of heavy rainfall,relief amplitude,river network density,vegetation coverage,population density,GDP density,farmland area ratio and mining area ratio,are selected for building up the factor set,and then descending semi-trapezoid distribution function is chosen to calculate the membership degree,while the weights of all the factors are calculated with analytic hierarchy process.On the basis of raster data,the process of the risk assessment is finished with the spatial analysis function of GIS.The assessment result shows that the proportions of the lowest risk area,lower risk area,medium risk area,the higher risk area and the extremely high risk area within the total area of the city are 36.86%,32.43%,14.69%,8.77% and 7.25% respectively.Through the verification on the assessment result made with the historical data of mountain torrent disaster therein,it is indicated that the assessment result is basically coincided with the local actual risk level,thus can be taken as the referential basis for the mountain torrent disaster control and management of Datong City.

关键词

山洪灾害/GIS/模糊综合评价法/层次分析法/风险评价

Key words

mountain torrent disaster/GIS, fuzzy comprehensive evaluation method/AHP/risk assessment

分类

大气科学

引用本文复制引用

敬双怡,莘明亮,于玲红,李卫平,任波,黄立志..基于模糊综合评价法的大同市山洪灾害风险评价[J].水利水电技术,2018,49(5):84-89,6.

基金项目

国家自然科学基金项目(41263010) (41263010)

内蒙古包头黄河湿地生态系统国家定位观测研究站运行补助项目(2015-LYPT-DW-037) (2015-LYPT-DW-037)

水利水电技术

OA北大核心CSTPCD

1000-0860

访问量0
|
下载量0
段落导航相关论文