摘要

Abstract

Considering the operation mode of battery charging and swapping stations (BCSSs) which can provide two kinds of power supply patterns simultaneously,i.e.the charging mode and swapping mode,the research on electric power supply strategy for an electric vehicles (EV) participating in logistics distribution is helpful to reduce the whole logistics cost.To accommodate the constraints of route selection,loading capacity,regular charging/discharging power,time and battery capacity,an optimal decision-making model is proposed for selecting EVs' power supply modes in BCSSs by choosing the logistics distribution route,charging/swapping mode and regular charging/discharging strategy as decision variables,and minimizing the sum of fast charging costs,swapping costs,total degradation costs of the EV participating in logistics distribution as the objective.Comprehensive numerical simulations are conducted on a 33-node logistics distribution system,and the impacts of the power supply mode selection of EVs in the BCSSs are analyzed,and the characteristic of the proposed method demonstrated.

关键词

电动汽车(EV)/充换电站(BCSS)/物流配送/电能补给方式

Key words

electric vehicle (EV)/charging and swapping station (BCSS)/logistics distribution/power supply pattern

分类

信息技术与安全科学

引用本文复制引用

常巩,邓友均,杨洪明,文福拴,赖明勇..充换电站模式下电动汽车参与物流配送的电能补给方式规划[J].电力建设,2018,39(6):7-14,8.

基金项目

国家自然科学基金项目(71331001,71420107027,91547113) (71331001,71420107027,91547113)

湖南省科技项目(2016WK2015,2016GK2109)This work is supported by National Natural Science Foundation of China (No.71331001,71420107027,91547113)and Science and Technology Projects of Hunan Province (No.2016WK2015,2016GK2109). (2016WK2015,2016GK2109)