| 注册
首页|期刊导航|铁道标准设计|黔张常铁路高山隧道巨型溶洞发育特征及工程评价

黔张常铁路高山隧道巨型溶洞发育特征及工程评价

罗文艺

铁道标准设计2018,Vol.62Issue(6):93-98,6.
铁道标准设计2018,Vol.62Issue(6):93-98,6.DOI:10.13238/j.issn.1004-2954.201707300001

黔张常铁路高山隧道巨型溶洞发育特征及工程评价

The Characteristic of Development and Engineering Evaluation of Giant Cave of Gaoshan Tunnel on Qianjiang-Zhangjiajie-Changde Railway

罗文艺1

作者信息

  • 1. 中铁第一勘察设计院集团有限公司,西安710043
  • 折叠

摘要

Abstract

The construction of Gaoshan tunnel on Qianjiang-Zhangjiajie-Changde Railway to DK53 + 678 reveals a giant cave,and the shape and distribution of the cavity are extremely complex,and the difficulty of the construction and safety risk are very high.In order to find out the development characteristics and the influence of the cave,the characteristics of the karst surface and the recharge and excretion characteristics of groundwater are identified by means of geological survey,drilling,geophysical and 3D laser scanning,and the stability of the roof and the wall is evaluated.The results provide an important geological basis for the formulation of the treatment scheme of the cave.

关键词

铁路隧道/岩溶隧道/发育特征/溶洞/成因/工程评价

Key words

Railway tunnel/Karst tunnel/Characteristic of development/Cave/Genesis/Engineering evaluation

分类

交通工程

引用本文复制引用

罗文艺..黔张常铁路高山隧道巨型溶洞发育特征及工程评价[J].铁道标准设计,2018,62(6):93-98,6.

铁道标准设计

OA北大核心

1004-2954

访问量0
|
下载量0
段落导航相关论文