| 注册
首页|期刊导航|铁道标准设计|动车模型热力除冰实验研究

动车模型热力除冰实验研究

邓保顺 沈德安 董建锴 谢腾

铁道标准设计2018,Vol.62Issue(6):185-189,5.
铁道标准设计2018,Vol.62Issue(6):185-189,5.DOI:10.13238/j.issn.1004-2954.201707120005

动车模型热力除冰实验研究

Experimental Research on Thermal Deicing with EMU Model

邓保顺 1沈德安 1董建锴 2谢腾2

作者信息

  • 1. 中铁第一勘察设计院集团有限公司,西安730000
  • 2. 哈尔滨工业大学市政环境工程学院,哈尔滨150090
  • 折叠

摘要

Abstract

In order to study the efficiency and energy saving of the deicing method for EMU,a thermal deicing experimental table of train model is set up.The method of experiment research is adopted to study the rate and energy consumption of the hot air deicing and analyze the influences of different deicing methods on indoor temperature.The infrared heating technology is proposed for deicing and its efficiency is studied.The experimental results show that under the experimental conditions,the shortest infrared deicing time is 66 min,while the shortest hot air deicing time requires 142 min.The rate of infrared deicing is 53.5% higher than that of the hot air deicing.Therefore,the rate of infrared deicing is much higher than that of the hot air deicing.The infrared deicing energy consumption is only 6.6 kW · h,when the infrared deicing distance is 0.5 cm,covering 35.7% of the energy consumption of the hot air melting.

关键词

动车模型/热风除冰/红外线除冰/能耗

Key words

EMU model/Hot air deicing/Infrared deicing/Energy consumption

分类

通用工业技术

引用本文复制引用

邓保顺,沈德安,董建锴,谢腾..动车模型热力除冰实验研究[J].铁道标准设计,2018,62(6):185-189,5.

基金项目

中国铁道建筑总公司科研专题项目(14-C55) (14-C55)

铁道标准设计

OA北大核心

1004-2954

访问量0
|
下载量0
段落导航相关论文