| 注册
首页|期刊导航|中国铁道科学|高速受电弓作用下接触网整体吊弦动态力研究

高速受电弓作用下接触网整体吊弦动态力研究

陈立明

中国铁道科学2018,Vol.39Issue(3):86-92,7.
中国铁道科学2018,Vol.39Issue(3):86-92,7.DOI:10.3969/j.issn.1001-4632.2018.03.12

高速受电弓作用下接触网整体吊弦动态力研究

Study on Dynamic Force of Integral Dropper of Catenary under Action of High-Speed Pantograph

陈立明1

作者信息

  • 1. 中国铁道科学研究院标准计量研究所,北京100015
  • 折叠

摘要

Abstract

The catenary of elastic chain type widely used at present for high speed railway in China was taken as the research object.The dynamic uplift of integral droppers obtained from field tests was used as the initial load of finite element simulation.The installation and construction process of the messenger wire,the contact line and integral droppers was simulated with the finite element model of catenary established by ANSYS software.Based on simulation results,the form-finding analysis and transient dynamics analysis for the catenary were analysed,and the changes of tension,compression and dynamic force of integral dropper under the action of pantograph were studied.Results show that the dynamic force of the integral dropper fluctuates greatly,which is about 6 times of its static force when the pantograph passes through.In the same span,the largest force fluctuations occur on number 1 and 5 integral droppersand with the maximum amplitude of compression.The compression frequency of number 3 integral dropper is the maximum.

关键词

高速铁路/整体吊弦/接触网/吊弦力/受电弓

Key words

High speed railway/Integral dropper/Catenary/Dropper force/Pantograph

分类

交通工程

引用本文复制引用

陈立明..高速受电弓作用下接触网整体吊弦动态力研究[J].中国铁道科学,2018,39(3):86-92,7.

基金项目

中国铁路总公司科技研究开发计划重点课题项目(2017J010-A) (2017J010-A)

中国铁道科学

OA北大核心CSCDCSTPCD

1001-4632

访问量0
|
下载量0
段落导航相关论文