考虑优先级的维修任务动态调度方法

王雄伟 陈春良 曹艳华 陈伟龙 吴同晗

兵工自动化2018,Vol.37Issue(6):83-87,5.
兵工自动化2018,Vol.37Issue(6):83-87,5.DOI:10.7690/bgzdh.2018.06.019

考虑优先级的维修任务动态调度方法

Dynamic Scheduling Method of Maintenance Task Considering Priority

王雄伟 1陈春良 1曹艳华 1陈伟龙 1吴同晗1

作者信息

  • 1. 装甲兵工程学院技术保障工程系,北京 100072
  • 折叠

摘要

Abstract

In view the problems of complex method, considering the problem of less scheduling rules and less practicability in current research of the maintenance task dynamic scheduling method, the dynamic scheduling method of maintenance tasks is optimized. First of all, considering scheduling rules of the maintenance time, waiting time before maintenance, the degree of enemy threats and equipment severity, the TOPSIS method used to determine the priority of the maintenance tasks. Then, the model of the dynamic scheduling of the maintenance task is established by live update the static scheduling scheme of the maintenance task at the critical time point in real time. Finally, the feasibility of the model is proved by the example analysis. The result shows that new model can solve complex problems in simple way, and provide reference for the equipment maintenance commander to determine the maintenance task scheduling scheme.

关键词

优先级/维修任务/动态调度/逼近理想解排序法

Key words

priority/maintenance tasks/dynamic scheduling/TOPSIS