±800kV糯扎渡直流工程交流滤波器合闸超前相位对避雷器动作情况影响分析

罗新 刘浩 黄学民 吴典校 何进西

广东电力2018,Vol.31Issue(6):133-138,6.
广东电力2018,Vol.31Issue(6):133-138,6.DOI:10.3969/j.issn.1007-290X.2018.006.020

±800kV糯扎渡直流工程交流滤波器合闸超前相位对避雷器动作情况影响分析

Analysis on Effect of Closing Phase of AC Filter of ±800 kV Nuozhadu DC Transmission Project on Arrester Action

罗新 1刘浩 2黄学民 1吴典校 1何进西1

作者信息

  • 1. 南方电网超高压输电公司广州局,广东 广州 510663
  • 2. 华南理工大学 电力学院,广东 广州 510641
  • 折叠

摘要

Abstract

Switching on of group filters at the converter station may cause different levels of transient impact on the system and frequent action and aging of the arrester. Therefore,this paper builds a simulation model for Nuozhadu DC transmission project by using PSCAD software and makes analysis and simulation on overvoltage,current and energy of the AC filter,and discusses reasons for frequent action of the arrester of AC filter. Corresponding results indicate switching on of the AC filter may produce impact in its own group filters and other group filters. As the closing phase of C type filter is 12°,the arrester of the own group filters acts,while when the closing phase is 18°,the arrester of the other group filters acts. Meanwhile, leading closing of a certain phase has no effect on overvoltage of the other phases,which means it can be considered three phases are in mutual independence.

关键词

交流滤波器/避雷器/选相/PSCAD/过电压

Key words

AC filter/arrester/phase selection/PSCAD/overvoltag

分类

信息技术与安全科学

引用本文复制引用

罗新,刘浩,黄学民,吴典校,何进西..±800kV糯扎渡直流工程交流滤波器合闸超前相位对避雷器动作情况影响分析[J].广东电力,2018,31(6):133-138,6.

基金项目

中国南方电网责任有限公司科技项目(CGYKJXM20170171) (CGYKJXM20170171)

广东电力

OACSTPCD

1007-290X

访问量0
|
下载量0
段落导航相关论文