现浇箱梁翼缘下模板支架立杆内力监测
Monitoring on internal force of standard under flange of formwork supporting system
摘要
Abstract
In order to study the law of internal force variation on standard under the girder flange formwork sup-port in pouring process and provide suggestion for the actual construction,taking the cuplock high formwork support under the city overpass from West-Sanhuan-Navigation-Road interchange project in Zhengzhou as an experiment.During the process of pouring concrete,the internal force of standard is monitored and analyzed in site,and the law of the change for internal force is concluded.The result show that the maximum pressure of standard under the girder flange is mainly in the upper.Just pouring completed sections is dangerous sections, the formwork support before and after the construction of section 10 m range is greatly influenced by concrete pouring;beyond the scope of the start-stop,there is smaller influence on it.There are more changes of stand-ard from tension to pressure when the speed of pouring concrete is too fast.It's suggested that the speed of pouring concrete should be controlled in actual construction,and taking proper measures to guarantee pouring in uniform symmetry.关键词
箱梁翼缘/碗扣式模板支架/浇筑过程/立杆Key words
flange of box girder/bowl fastening type scaffolding/process of pouring/standard分类
建筑与水利引用本文复制引用
史瑞,侯杰,宋建学..现浇箱梁翼缘下模板支架立杆内力监测[J].河南城建学院学报,2018,27(3):6-12,7.基金项目
"郑州市科技领军人才"(112PLJRC353) (112PLJRC353)