| 注册
首页|期刊导航|南昌工程学院学报|水库大坝高温季节混凝土温度控制措施及分析

水库大坝高温季节混凝土温度控制措施及分析

林万青 衡阳 吴阳锋

南昌工程学院学报2018,Vol.37Issue(3):24-28,5.
南昌工程学院学报2018,Vol.37Issue(3):24-28,5.

水库大坝高温季节混凝土温度控制措施及分析

Analysis of concrete temperature control measures for Reservoir in hot season

林万青 1衡阳 1吴阳锋1

作者信息

  • 1. 浙江省水利水电工程质量与安全监督管理中心,浙江杭州310007
  • 折叠

摘要

Abstract

The temperature control of concrete is always the key and difficult point in the construction when the mass con-crete is poured in high temperature season. By making scientific and reasonable temperature control measures,the internal temperature control of concrete is realized and the quality of the construction is guaranteed for the Qian-ming Reservoir in the high temperature season. The temperature related data are collected and analyzed in the later period,which proves the reasonableness of the temperature control measures.

关键词

大体积混凝土/温控/混凝土配合比/施工程序

Key words

mass concrete/temperature control/concrete mix ratio/construction procedure

分类

建筑与水利

引用本文复制引用

林万青,衡阳,吴阳锋..水库大坝高温季节混凝土温度控制措施及分析[J].南昌工程学院学报,2018,37(3):24-28,5.

南昌工程学院学报

1674-0076

访问量2
|
下载量0
段落导航相关论文