| 注册
首页|期刊导航|水利水电科技进展|PHC-钢管组合桩高应变检测修正方法

PHC-钢管组合桩高应变检测修正方法

王海军 汤雷 官福海 胡骏文 杨石扣

水利水电科技进展2018,Vol.38Issue(4):70-74,5.
水利水电科技进展2018,Vol.38Issue(4):70-74,5.DOI:10.3880/j.issn.1006-7647.2018.04.012

PHC-钢管组合桩高应变检测修正方法

Modification method for high strain test of PHC-steel compound piles

王海军 1汤雷 1官福海 1胡骏文 1杨石扣2

作者信息

  • 1. 南京水利科学研究院水文水资源与水利工程科学国家重点实验室,江苏 南京 210029
  • 2. 河海大学力学与材料学院,江苏 南京 210098
  • 折叠

摘要

Abstract

To solve the problem of the ultimate bearing capacity in design and the difficulty in high strain test for nontraditional PHC-steel compound(PSC)piles,high strain test and vertical static load test were carried out.Three PSCs made of PHC and steel piles were designed with different length ratios.Pile-sinking was performed using the hammering method,and the vertical bearing capacity of the PSC was obtained by in situ high strain test and vertical static load test.Then,a modification for the high strain measured curve fitting method was proposed by theoretical analysis.The results show that the vertical bearing capacity of the PSCs measured by the high strain measured curve fitting method is higher than that from the static load tests while the results computed by the proposed modification method were in consistent with the static load tests.Therefore,the modification method can be applied to the measurement of the vertical bearing capacity of the PSCs.

关键词

PHC-钢管组合桩/极限承载力/高应变试验/静载试验/修正方法

Key words

PHC-steel compound pile/bearing capacity/high strain test/static load test/modification method

分类

建筑与水利

引用本文复制引用

王海军,汤雷,官福海,胡骏文,杨石扣..PHC-钢管组合桩高应变检测修正方法[J].水利水电科技进展,2018,38(4):70-74,5.

基金项目

江苏省交通运输科技成果转化项目(2014T13) (2014T13)

中央级公益性科研院所基本科研业务费专项(Y417010,Y417016) (Y417010,Y417016)

水利水电科技进展

OA北大核心CSCDCSTPCD

1006-7647

访问量0
|
下载量0
段落导航相关论文