铁道标准设计2018,Vol.62Issue(7):68-73,6.DOI:10.13238/j.issn.1004-2954.201708090008
基于铁路施工图评审评价模型的原理与技术改进研究
Principle and Technical Improvement of the Evaluation Model of Construction Drawing
摘要
Abstract
During the construction of high-speed railway project,evaluation is an important work in the early period of designing process.In the process of information penetration,it is very important to establish a model and algorithm of rules to support complex evaluation and reduce influence factors in statistical process.The research employs an improved model of evaluation algorithm based on the improved mathematical model with big data analysis of influence factors.This algorithm is used the first time in the evaluation of the construction process.The results show that the system can effectively reduce deviation and its application is promoted by the engineering management center in the evaluation of all design institutes during 2016 and 2017,which demonstrates the practicability and advancement of the system.关键词
铁路/施工图/评价/演化算法/大数据模型Key words
Railway/Construction drawing/Evaluation/Evolutionary algorithm/Big data model分类
交通工程引用本文复制引用
王超,卢文龙..基于铁路施工图评审评价模型的原理与技术改进研究[J].铁道标准设计,2018,62(7):68-73,6.基金项目
中国铁路总公司科技研究开发计划课题(重点课题) (2017G001-C) (重点课题)
中国铁路总公司科技研究开发计划课题(2017X005-D) (2017X005-D)
中国铁道科学研究院科研项目(重大课题)(2016YJ098) (重大课题)