| 注册
首页|期刊导航|铁道标准设计|兰新高速铁路128m简支系杆拱设计

兰新高速铁路128m简支系杆拱设计

杨正华

铁道标准设计2018,Vol.62Issue(7):74-81,8.
铁道标准设计2018,Vol.62Issue(7):74-81,8.DOI:10.13238/j.issn.1004-2954.201711210003

兰新高速铁路128m简支系杆拱设计

Design of 128 m Simply Supported Tied-Arch Bridge on Lanzhou-Urumqi High Speed Railway

杨正华1

作者信息

  • 1. 中铁第一勘察设计院集团有限公司,西安 710043
  • 折叠

摘要

Abstract

128 m simply supported beam-arch combined structure is used for the main bridge of Urumqi river extra-long bridge on Lanzhou-Urumqi high speed railway.By analyzing the difficulties and control factors in the design,this paper introduces the structural design,including structural dimension,design procedures and relevant stiffness controlling measures.In addition,with the aid of finite element analysis software,dynamic and stability analysis is conducted.The results show that the post-construction deformation of the long span simply supported beam-arch combined structure meets the requirements for laying the ballastless track through reasonable allocation of stiffness between beam and arch and other special treatment measures.The conclusions of this paper provide useful references for the design of similar tied-arch bridge with parallel hangers.

关键词

铁路桥/简支梁/梁拱组合结构/系杆拱桥/结构设计

Key words

Railway bridge/Simply supported beam/Beam-arch combined structure/Tied-arch bridge/Structural design

分类

交通工程

引用本文复制引用

杨正华..兰新高速铁路128m简支系杆拱设计[J].铁道标准设计,2018,62(7):74-81,8.

铁道标准设计

OA北大核心

1004-2954

访问量0
|
下载量0
段落导航相关论文