福厦客运专线乌龙江特大桥主桥方案研究

任征

铁道标准设计2018,Vol.62Issue(7):81-86,6.
铁道标准设计2018,Vol.62Issue(7):81-86,6.DOI:10.13238/j.issn.1004-2954.201708180002

福厦客运专线乌龙江特大桥主桥方案研究

Research on Scheme of Wulongjiang Railway Bridge on Fuzhou-Xiamen PDL

任征1

作者信息

  • 1. 中铁第四勘察设计院集团有限公司,武汉 430063
  • 折叠

摘要

Abstract

Wulongjiang extra-long railway bridge on Fuzhou-Xiamen PDL traversing Wulongjiang river is the key project of the whole line,and the construction conditions and boundaries for span arrangement on the bridge site are complex.In order to determine the most suitable bridge type,comparison and analysis are conducted of the two schemes of bridge type,including the cable-stayed bridge and the steel truss girder suspension bridge following design requirements for safety,functionality,cost-effectiveness and aesthetics.It is concluded that the hybrid girder cable-stayed bridge with two unequal-height pylons(spans of(72+109+432+56+56)m)is the most appropriate one to be recommended.The bridge will be the first long-span hybrid girder cable-stayed bridge with two unequal-height pylons for four railway lines in the world after completion.

关键词

铁路桥/高低塔斜拉桥/混合梁/钢桁梁悬索桥/方案研究

Key words

Railway bridge/Cable-stayed bridge with two unequal-height pylons/Hybrid girder/Steel truss girder suspension bridge/Scheme research

分类

交通工程

引用本文复制引用

任征..福厦客运专线乌龙江特大桥主桥方案研究[J].铁道标准设计,2018,62(7):81-86,6.

基金项目

中国铁路总公司科技研究开发计划项目(2016G002-1) (2016G002-1)

中铁第四勘察设计院集团有限公司科研课题(2017K005) (2017K005)

铁道标准设计

OA北大核心

1004-2954

访问量5
|
下载量0
段落导航相关论文