摘要

Abstract

According to a large-section tunnel construction under a metro and underground business street in weak stratum,Midas-GTS numerical simulation is conducted to analyze the safety of the construction with PBCRD method.Research results show that PBCRD method could control displacement and ensure safety of the metro and underground business street,and preliminary support,temporary support and secondary lining of large-section tunnel are also safe guarded.Based on simulating results,construction strategies are provided as the followings.High pressure horizontal shot pile should be used to improve the stratum; advance geology forecast and non-blasting excavation should be employed; tunnel face should be closed and preliminary lining constructed in time; detailed scheme should be given in advance for piles penetrating the newly built tunnel.The structure constructed with PBCRD method has good integrity,less stress transformation,sufficient space for construction and pilot tunnel,and less secondary lining procedures.Meanwhile,it ensures the safety of quick tunnel construction and that of the adjacent buildings.

关键词

铁路隧道/先墙后拱交叉中隔壁法/三维数值计算/近接工程/设计对策

Key words

Railway tunnel/PBCRD/3D numerical calculation/Adjacent project/Design strategy